Facility
Operating Theatre & Surgery Facilities
Sector
Healthcare
Building Size
800m2
Location
Newry
Installation to Completion
40 Weeks

Project
Summary
View Project Gallery
This complex 800m² extension was constructed offsite by McAvoy and installed on a specially engineered steel gantry, 15 metres above ground level. This solution allowed the new facilities to be connected to the existing theatre complex at first floor level of the main hospital to maintain patient flows. A 230m² plant room was located on the roof to accommodate specialist air handling equipment and other M&E systems.
Key objectives for the project included the need for flexibility, versatility, sustainability and value for money.
View Project Gallery